Sealing series
         Metal Gaskets 
         Half Metal Gaskets 
         Metalloid Gaskets 
         Expansive graphite packing ring 
         
         
        · Products show
        · Parameters
        · Aplication
        · Techniacl Data
         
         
          Seal packing Installation Guid Print】 【Back
        read[1233]times
            Seal Packing Installation Guide
         
        1.Installation preparations
        Removal of the old filler packing box is a kind of pre-inspection preparation for the installation of the key elements.
        Packed with old before they fill all out with special tools to stuffing box. Wipe clean. Stuffing box observe whether the defects such as eccentric injury, stem injury, bushings and stuffing box can affect performance of packing. Also check whether other parts. Replace all the defective parts.
        2. Choose a suitable packing
        Packing in the selection must be taken into account two things.
        Packing condition and performance requirements should match. According to the relevant technical data can be selected to meet the requirements of the Packing. If in doubt, consult a sales representative.
        Seal requirements must be based on the correct choice of Packing’s Size. In order to determine the cross-section, please use the following formula calculations: Cross-section=( Stuffing box Diameter- Stem Diameter)/2
        In order to compensate for injury may require the installation more larger cross-section of thepacking.
        3. Cutting and installation
        Cut off by cutting mechanical precision required length of the Packing ring. If there is none of mechanical,underL=(D+S)X1.07X丌 for cutting. General rotation axis, with 90 ° cutting straight; valves on the cutting 45 °. Never attempt to stuffing box with packing around to determine the length. Otherwise will be in the Packing around the same with the stem of a pipe OD, and it"s tightly repressed, but not tensile it. Then cut its kind ring
        , and test whether it can accurately fill space. And ensuring that its interface does not have gaps. Central then can be used like other cutting as a standard packing rings. If these products in the plane completed, if the packing is soft or easily deformed, can be produced in accordance with a small ring-like scallops, and then according to the rope to produce the remaining filler ring.
        When the packing for valve, packing section’s space and the same of the valve, surcharging central is the best.when for pump, packing section and valve space, packing to a shaft and a leaking space is conducive to lubrication and cooling.
        One-time installation packing rings, must fill each convinced that no dust or other debris viscosity. If you need, packing rings should be used in stem on the same clean lubricating oil to be. Each installation staggered packing rings 90 °Central started slowly in the axial, the radial distance to axis can be loaded to the central. Fill tool use professional to fastening packing rings. When the installation is complete,grand stretched its valve on the Stuffing box until 25% of the thickness of packing, pump 50% of the thickness. Follow-up pieces use of its closed, can increase tightness. Remember, follow-up pieces were only as a supplement, cab ensure that all appropriate packing rings position to avoid packing mobile.


        Reciprocating pumps, fill the box at both ends and intermediate orientation should Add to Central, to maintain its concerted campaign by the plunger and gravity.
        按此在新窗口瀏覽圖片 按此在新窗口瀏覽圖片 按此在新窗口瀏覽圖片
        4. Rotating and reciprocating pump start
        Before operation, Load first state in the absence of commissioning,Observation of atypical,then official car, careful observation, there is no pressure or hard.and causing serious leak or burn filler phenomenon. Pump startup that is the key to its leakage at the beginning. If one started to leak Pan-gen without fastening to the state, will lead to leakage burns packing.
          Fill in the ring after installation, twisting bolts, and recognizing the filler material covered me with the right of joint. Once Bolt, it is necessary to ensure that all the bolts of the uniform.
          If the application of an external lubrication system, that should be prior to the commencement of its operation to correct.
        Startup allows leakage rate. In the process, the Pan-gen Yasui and begin work.
          After running about 15-30 minutes, until once again Setscrew allowed to leak. Recommended leakage of 8-10 points / minute. Tetrafluoroethylene filler should be allowed to export a greater flow of heat to reduce thermal expansion.
        5. Valve launched
          Most, zero leakage valve design.In order to achieve this, we must refer to the pressure valve in the fastening of the filler completely.
        6. Valve Installation Guide with Packing
        a. Pump used in strict accordance with the Pan-gen Installation Guide to operate;
        b. Rotating around the valve to ensure that the bolt free rotation;
        c. Check valve operation, if found leakage reference to the relevant safety procedures and maintenance vendors recommend appropriate adjustments.

         
        Print】 【Back
         
        All rights reserved by m.nfnkzx.com
        Tel:0086-577-86928956 86928957   Fax:0086-577-86928955   E-mail: sales@wskmj.com  Add: Xi'an Zone, Chuanliao Town, Lishui City, China
         
        日韩在线中文字幕制服丝袜| 亚洲中文字幕无码爆乳AV| 最新版天堂中文在线| 无码中文字幕日韩专区| 天堂Aⅴ无码一区二区三区| 中文午夜乱理片无码| 国产成年无码久久久久毛片| 久久久久久精品无码人妻 | 亚洲日韩精品一区二区三区无码 | 最好看的2018中文在线观看| 日韩欧精品无码视频无删节| 国产又爽又黄无码无遮挡在线观看 | 日韩精品久久无码中文字幕| 国产乱妇无码大片在线观看| 无码精品人妻一区二区三区人妻斩 | 亚洲av无码一区二区三区不卡| 最近中文字幕免费mv在线视频| 日韩成人无码中文字幕| 久久久久成人精品无码| 欧洲成人午夜精品无码区久久 | 亚洲AV无码AV男人的天堂| 中文字幕在线免费| 中文字幕日韩一区| 中文网丁香综合网| 99精品久久久久中文字幕| 免费A级毛片无码A∨中文字幕下载 | 无码人妻精品一区二区三区夜夜嗨 | 亚洲AV无码乱码精品国产| 精品无码三级在线观看视频| 国产AV无码专区亚洲AV男同| 人妻精品久久无码专区精东影业| 无码人妻一区二区三区免费看| 亚洲VA中文字幕无码一二三区 | 无码一区二区三区老色鬼| 无码一区二区三区免费| 无套中出丰满人妻无码| 无码AV波多野结衣久久| 无码一区二区三区老色鬼| 精品爆乳一区二区三区无码av| 国产精品无码a∨精品| 久久久久亚洲AV无码专区网站|